Sampling
Samples of concrete from concrete delivery vehicles for acceptance tests should be obtained in accordance with ASTM C172. The sample should be obtained at the end of the truck chute. Two or more portions of concrete as discharged from the middle portion of the load are composited to obtain a sample that is representative of the load. When the specification requires additional tests to be conducted at the point of placement in the structure after concrete has been moved through some conveying means (such as a pump, bucket or conveyor), sampling procedures should be conducted such that the means of conveyance is not temporarily shut off or relocated to ease sampling as this can temporarily change the properties measured. ASTM C94 permits a preliminary sample to be obtained after 0.25 yd3 (0.20 m3) has been discharged to measure slump and air content and make appropriate adjustments to the load at the jobsite. The preliminary sample should not be used to make specimens for acceptance tests of hardened concrete.