Optimum concrete mixture design results from selecting locally available materials that make the fresh concrete placeable and finishable and that ensure the strength development and other desired properties of hardened concrete as specified by the designer. Some of the basic concepts that need to be understood for high strength concrete are:
More attention and evaluation will be necessary if the job specification sets limits for other concrete properties such as creep, shrinkage, and modulus of elasticity. The engineer may set limits on these properties for the design of the structure. Current research may not provide the required guidance for empirical relationships of these properties from traditional tests and some of these tests are quite specialized and expensive to conduct for mixture evaluation. From theoretical considerations, lower creep and shrinkage, and high modulus of elasticity can be achieved with higher aggregate and lower paste volumes in the concrete. Using the largest size aggregate possible and medium to coarsely graded fine aggregate can attain this. Smaller maximum size aggregate such as 3/8 inch (9.5mm) can be used to produce very high compressive strength but required properties like creep, shrinkage, and modulus of elasticity may be sacrificed. If difficulty is encountered in achieving high strength, simply adding more cementitious material may not increase strength. Factors such as deleterious materials in aggregates, aggregate coatings, coarse aggregate fracture faces, shape and texture, and testing limitations may prevent higher strength from being achieved. Final concrete mixture proportions are determined by trial batches either in the laboratory or by small size field production batches. The production, transportation, placement and finishing of high strength concrete can differ significantly from procedures used for conventional concrete. For critical projects, it is highly recommended that a trial pour and evaluation be conducted and included as a pay item in the contract. Pre-bid and pre-construction meetings are very important to ensure the success of projects using high strength concrete. During construction, extra measures should be taken to protect against plastic shrinkage and thermal cracking in thicker sections. High strength concrete may need longer time before formwork is removed.
High strength concrete test cylinders should be carefully molded, cured, capped, and tested. Extra care and attention to handling of test cylinder specimens at very early age is necessary. Slower setting time of high strength concretes may be experienced. The ASTM Standards are continuously being revised to account for additional special precautions needed when testing high strength concrete. Particular attention should be paid to the type of mold, curing, type of cylinder capping material, and characteristics and load capacity of the testing machine.