According to ASTM C31, strength results of standard-cured cylinders are used for:
It is important that the specimens are made and cured following standard procedures. Any deviation from standard procedures will result in a lower measured strength and cause undue concern, cost, and delay to the project.
Field-cured cylinders are used for:
Because of the different purposes for strength test results, procedures for standard-curing differ from field-curing and the two should not be confused. Refer to ASTM C31 for details.
It is critical that the sample of concrete obtained from the delivery vehicle is representative of the load. Sampling should be conducted in accordance with ASTM C172. Concrete should be sampled from the middle of the load. The first or last 10% of the discharge will not be representative and should not be used for the sample. From a truck mixer, the entire discharge stream should be diverted into a wheelbarrow. At least two portions are necessary to obtain a composite sample. The time between the first and final portion of the composite sample must not exceed 15 minutes. Minimum sample size required is 1 ft3 (28 L).
Cover the sample to protect it from evaporation, sunlight and contamination. Move the sample to the location where the fresh concrete tests will be conducted and where the cylinders will be stored for the initial curing period. Remix the concrete in the wheelbarrow. Begin slump, density (unit weight) and air content tests within 5 minutes and start molding cylinders within 15 minutes after the sample was obtained.
• Cylinder identification labels should be placed on the outside of the mold and not on the lids or tops
• Place the cylinder molds on a level surface
• Consolidation—Use vibration for concrete slump less than 1-in. (25-mm); rodding or vibration is permitted when slump 1-in. (25-mm) or higher
• Layers—For samples that are vibrated, fill mold in two equal layers; for rodded samples, place concrete in 3 equal layers for 6 x 12-in. cylinders and in 2 equal layers for 4 x 8-in. cylinders
• Distribute concrete inside the mold with the scoop. Rod each layer 25 times evenly distributed. For vibration, insert it long enough until large air bubbles are released. Two insertions of the vibrator are required for 6 x 12-in. and one insertion for 4 x 8-in. cylinders. Avoid over-vibration. Consolidate bottom layer throughout its depth; for upper layers penetrate 1-in. (25-mm) into underlying layer.
• Tap sides of the mold 10-15 times with the mallet to close any insertion holes formed during consolidation.
• Strike off the top with a wood float or trowel to produce a flat and even surface level with the edge of mold. Cover with a plastic lid or a plastic bag.
• Move cylinder molds with fresh concrete very carefully by supporting the bottom
• Place the cylinders on a flat surface and in a controlled environment. Maintain temperature during initial curing in the range of 60-80⁰F (16-27⁰C). When concrete specified strength is greater than 6000 psi (40 MPa), the maintain temperature in the range of 68-78⁰F (20- 26⁰C). Immersing cylinders, completely covered in water, is an acceptable and preferred procedure that ensures more reliable strength results. Temperature in storage containers should be controlled using heating and cooling devices as necessary. The maximum and minimum temperature should be recorded and reported.
• Protect cylinders from direct sunlight or radiant heat and from freezing temperatures in winter.
• Cylinders must be transported back to the laboratory within 48 hours of casting. Cylinders should not be moved until at least 8 hours after final set.
When transporting cylinders, they should be protected to prevent damage, maintain temperature and prevent loss of moisture. Transportation duration from the jobsite to the laboratory should not exceed 4 hours.
Fresh concrete can cause severe chemical burns to skin and eyes. Keep fresh concrete off your skin. When working with concrete use rubber work boots, gloves, protective eyeglasses and clothing. Do not let concrete or other cement-based products soak into clothing or rub against your skin. Wash your skin promptly after contact with fresh concrete with clean water. If fresh concrete gets into your eyes, flush immediately and repeatedly with water. Consult a doctor immediately. Keep children away from all freshly mixed plastic concrete.